ZONING SOLUTIONS
Interactive self-assessment to check project feasibility & permit readiness.
FEASIBILITY REQUIREMENTS
Property Cadastral PIN and Plat of Survey are available
Essential to confirm exact parcel boundary and lot square footage.
Current zoning district verified (e.g. RS-3, RT-4, B3-2)
Determines whether your proposed use is permitted as-of-right or requires re-zoning.
Maximum Floor Area Ratio (FAR) & height limits calculated
Establishes the allowable square footage envelope before design begins.
Within 2,640 ft of CTA / Metra station for TOD parking relief
Eligible for Connected Communities parking reductions.
Historical Landmark or Lake Michigan Protection check conducted
Prevents unexpected Commission on Chicago Landmarks delays.
Initial ward aldermanic consensus consulted
Ward alderman holds key influence on variances and map amendments.
PERMIT REQUIREMENTS
Architectural drawings stamped by licensed Illinois architect
Mandatory for all standard Chicago Department of Buildings submittals.
MEP (Mechanical, Electrical, Plumbing) engineered sheets included
Required for commercial or multi-family plan examiner approvals.
Zoning ordinance setback calculations verified against plot plan
Confirms front, rear, and side yard clearances comply with Title 17.
General Contractor licensed and bonded with City of Chicago
Required before building permit placard can be officially released.
Energy Conservation Code compliance documented
Chicago Energy Transformation Code compliance documentation.
Need Assistance Clearing These Items?
Williams & Williams LLC conducts certified surveys, FAR modeling, and permit expediting.